Tuesday, October 19, 2010

The Solution for Every Problem

Do not Rush....

What Allaah has mentioned in the hadeeth qudsi of the great virtues of those whom He loves. It was narrated that Abu Hurayrah said:
The Messenger of Allaah (peace and blessings of Allaah be upon him) said: "... and My servant continues to draw near to Me with supererogatory works (nawafil) so that I shall love him. When I love him I am his hearing with which he hears, his seeing with which he sees, his hand with which he uses and his foot with which he walks. Were he to ask [something] of Me, I would surely give it to him, and were he to ask Me for refuge, I would surely grant him it." {Narrated by al-Bukhaari, 6502.}

This hadeeth qudsi includes a number of benefits of Allaah's love for His slave:

1) "I am his hearing with which he hears" i.e., he does not listen to anything but that which Allaah loves.
2) "his seeing with which he sees" i.e., he does not see anything but that which Allaah loves.
3) "his hand with which he uses " i.e., he does not do anything with his hand but that which Allaah loves.
4) "and his foot with which he walks" i.e., he does not go towards anything but that which Allaah loves.
5) "Were he to ask [something] of Me, I would surely give it to him" i.e., his du'aa's are heard and his requests are granted.
6) "and were he to ask Me for refuge, I would surely grant him it" i.e., he is protected by Allaah from all things...

We ask Allaah to help us to please Him.

And Allaah knows best.



Friday, October 15, 2010

Updates on ML-5



TOTAL E&P Borneo BV (TEPB) said it believes there is a good indication for oil and gas production at the ML-5 well in Block B within three to four years.

Yves Grosjean, general manager of TEPB, emphasised though that it is still in an early stage and might be too soon to tell.

Grosjean said: "We would say there is good indication of commerciality but it won't be immediate as it will require a new phase of development of the field."

He told The Brunei Times in a telephone interview yesterday that the time it takes just to construct and install a new platform, which is required, will take three to four years.

Total in a statement on Tuesday said that during their tests, 10 million cubic feet of gas and 220 barrels per day of condensate were produced, from a zone situated at 5,350m depth.

However, Grosjean said that the production tests they have carried out do not represent the full extent of what the well will produce during commercial production because only a limited part of the reservoir was tested.

"There is more data to be acquired for us to fully carry out the model of the field. The other data will be enough to bridge the gap to compute future production, but it's too early to say anything now," he added.

Grosjean explained that the findings from ML-5 tell of gas at high pressure conditions in the earth and contains significant amounts of liquid dissolved in it.

"Therefore, during production process, we recovered a large volume of gas but also interesting volumes of liquids which we call condensate, which is actually liquid petroleum," said Grosjean, adding that the content of the liquid is normal for a well.

He went on to say that condensate is liquids which are dissolved in the gas when it is at a pressure down in the earth.

"So when we produce this gas, which is rich in liquids during the process, we can extract the liquid and this process is condensation. Just as steam condensates to become water," he explained.

On Tuesday, Total's statement said that the ML-5 well, the deepest ever drilled in Brunei, located offshore in Block B.

It discovered gas with condensate in High Pressure/High Temperature formations (HP/HT), with a total vertical depth of 5,664m.

"It is a beauty to be producing at such great depth and pressure and it is indeed (where) you normally find gasses which are rich in liquids," said Grosjean.

Total claims this is the deepest successful test in Southeast Asia and the gross thickness of hydro-carbon bearing formation exceeds 800m.

The ML-5 well is the third positive well of an exploration campaign which started in 2007, targeting the deep HP/HT horizons of the Maharaja Lela structure.

"The development of the new resources and production through the existing facilities is currently being studied," said Total.

Total operates the Maharaja Lela/Jamalulalam field with a 37.5 per cent interest. Its average production of gas and condensate was more than 28,000 barrels of oil equivalent per day last year. The Brunei Times

Wednesday, October 13, 2010

New gas, condensate discovery in Block B


Thursday, October 14, 2010
TOTAL E&P Borneo has announced a "significant" new gas and condensate discovery in the ML-5 well, the deepest ever drilled in Brunei, located offshore in Block B, Total said yesterday.

In a press statement late last night, French oil and gas company Total said the ML-5 well, located in a water depth of 65m and around 50km from the coastline, was drilled eight km to the south of the Maharaja Lela/Jamalulalam field in a new, deep fault panel.

It discovered gas with condensate in High Pressure/High Temperature formations (HP/HT). With a total vertical depth of 5,664m, the well is the deepest ever drilled in Brunei, said Total.

During tests, 10 million cubic feet of gas and 220 barrels per day of condensate were produced, from a zone situated at 5,350m depth.

Total claims that this is the deepest successful test in Southeast Asia.

The gross thickness of the hydrocarbon bearing formation exceeds 800m, it said.

The ML-5 well is the third positive well of an exploration campaign which started in 2007, targeting the deep HP/HT horizons of the Maharaja Lela structure.

The development of the new resources and production through the existing facilities is currently being studied, Total said.

Total operates the Maharaja Lela/Jamalulalam field, located in Block B with a 37.5 per cent interest. Its average production of gas and condensate was more than 28,000 barrels of oil equivalent per day last year. The French company also announced that it would resume its explorations in Block CA-1, following the Deed of Amendment signed, with a 54 per cent interest.

The Brunei Times

Saturday, October 9, 2010

Block L Exploration Well Reaches Final Depth

Updated

Calgary, Alberta - Kulczyk Oil Ventures Inc advised that the Lempuyang-1 exploration well in Block L, onshore Brunei Darussalam has reached a final total depth ("TD") of 3,220 metres measured depth from rotary table ("MDRT") (2,817 metres true vertical depth), according to Marketwrire.


The preliminary interpretation of the wireline logs suggests gas charged reservoirs may have been encountered in three target horizons.
The drilling and wireline logging of the Lempuyang-1 well is now complete and a 4.5" liner is being set to total depth in preparation for the 'possible testing of the well.
The TD was set above the original proposed depth of 3,500 metres MDRT because of drilling challenges associated with managing overpressures in the well.
Overpressure was expected and accounted for in the original well design.
However, several significant gas kicks encountered while drilling meant that the design needed to be modified to suit the conditions in the wellbore.
Three of the four target horizons in the wellbore were fully penetrated and assessed by the well. However, only the upper part of the lowest horizon (Green) was intersected.
The preliminary interpretation of the wireline logs indicates possible gas-charged reservoirs at each of the three lowest target horizons.
The Lempuyang prospect comprises five fault blocks with up to five target horizons in each block. A 3-D seismic data acquired in May 2009 indicated seismic amplitude anomalies which appeared to correspond to the target zones. Lempuyang-1 was designed to intersect four of the five seismic horizons.
The operator has advised that they intend to proceed to a testing programme and are optimistic about the commerciality of the prospect.
However, Kulczyk Oil has yet to reach a similar conclusion as it is still reviewing the well data and believes that a decision as to whether or not the Lempuyang prospect can be commercially developed can only be reached after both testing and further drilling.
The partners in Brunei Block L and in the Lempuyang-1 well are Kulczyk Oil Brunei Limited (40 per cent), AED South East Asia Limited (50 per cent) and QAF Brunei Sdn Bhd (10 per cent).
Kulczyk Oil also owns an interest in Block M, the other onshore exploration block in Brunei, through KOV Borneo Limited, an indirect wholly-owned subsidiary of Kulczyk Oil, which has a 36 per cent interest in Block M and in each of the Mawar-1 and Markisa-1 wells.
Kulczyk Oil is an international upstream oil and gas exploration company with a diversified portfolio of projects in Brunei, Syria and Ukraine and with a risk profile ranging from exploration in Brunei and Syria to production and development in Ukraine.
In Brunei, KOV owns working interests in two production sharing agreements which gives the company the right to explore for and produce oil and natural gas from Block L and Block M.
KOV owns a 40 per cent working interest in Block L, a 2,220 square kilometre (550,000 acre) area covering onshore and offshore areas in northern Brunei and a 36 per cent working interest in Block M, a 3,011 square kilometre (744,000 acre) area onshore in southern Brunei. -- Courtesy of Borneo Bulletin

Friday, October 8, 2010

Exam fever

Wish me luck for my first exam paper on this Thursday...

Stay awake all the night long....
wishing the night could be longer.....
Wishing once read, will never forget ....
excitement and nervousness are the games
Which one will be the dominant....
Will be known soon...

Gulf Of Mexico : Oil leak estimation




 How much  Oil has been Leaked into the Gulf of Mexico ?

No One Knows... because you don't want to be blamed

Petrol pumps meter cheating...




MOTORISTS are complaining about rampant cheating at some petrol stations.

They said cheatings still occur even though filling stations put up notices advising customers to monitor the meter while attendants pump petrol into their tanks.

Recently, a motorist who declined to be identified, filled her salon car with half tank of petrol during daytime which usually costs her between $18 and $20. While the pump nozzle was stuck in the tank, the consumer continued, the counter did not reach zero and she ended up paying $25.

"The car before mine pumped $5 fuel, as seen on the meter. Without resetting the fuel pump, the attendant started pumping fuel and the meter jumped to $6.50 within two seconds and I only managed to stop it when the attendant pumped up to $10," said the motorist.

The woman said that the modus operandi that the attendant used was to ask the driver to move the car forward to make way for an incoming car. By doing so, the attendant blocks the driver's view of the meter, while the pump is running.

Such practice, according to the motorist, occurred in Telisai, Jerudong and Gadong, after discussing it with friends on online social networks.

Nasehin Yahya, manager of a petrol station in Gadong, said yesterday he was aware of consumers complaining about the petrol pump's meter cheating, although none of the incidents have been reported at his station.

"It is better for customers to report directly to the gas station (supervisor) if there is any incident that upset them, so the matter will be resolved immediately," Nasehin told The Brunei Times.

He said that if such incident ever occurred, the company will conduct an investigation. "However, if we found that our staff were being dishonest or cheating the customers, we will immediately terminate them," he said.

Nasehin added that all his staff were prohibited from practising such dishonest behaviour. "We told them that the company knows all possible tricks, so don't try one."

He explained that every night when the staff do the sales calculation, they have to make sure that the amount of outgoing petrol tallies with the money received.

To provide its best service for the customers, the station is required to follow the general rules known as "the eight steps".

The steps are: greetings: ask the customers what type of service or product they need; apply safety standards which include requesting customers to present container approval, switch off cellular phone and no smoking in the premises; collect the payment; inform the customers about promotion products; and remind motorists to drive safely.

A supervisor of another gas station in Bandar area who refused to be named said that any employee found cheating the customers will be immediately terminated. "This will not need any prior warning because we will take strict action of terminating our staff who have cheated at the gas pump," the supervisor said.

He added that every day, a routine check must be done before the gas station opens for business. The check list consists of making sure that all dispensers are functioning; dispenser, nozzle, handles, hoses and splash guards clean and undamaged.

Both of them said that sometimes they found that in the case of an old type of car, it will need some time for the petrol to fill the tank. Some motorists even complained that the amount of petrol did not match the amounts paid, but in actuality, it takes some time for the gas to fill the tank, they explained.

The Brunei Times

P/S : It was reported the incident happened in several petrol station in  the country, Is it true that the staffs are cheating? or it happened due to some machine error- could be due to new machines were installed in these stations... 

This incident remind me of a theory of Refilling your Oil Tank, some people believe that, you get more petrol a.k.a paying less for petrol if you buy it early in the morning. 
This theory is based on that, when the temperature is low (in the morning), the oil contract, and since oil is calculated by volume, you get more oil for the same price. 


Logically the theory should works but I am not sure either it really happens. How about if the station heated up the oil by certain degree, then you ll get less oil a.k.a you pay higher... :)

Thursday, October 7, 2010

Block M Well Shows ‘Better Than Expected' Sand Quality

Kuala Belait - Markisa -1 exploration well in Block M, the largest onshore project in Brunei Darussalam, has started to yield optimistic results.

According to Marketwire, drilling, which began on September 26 this year, it has reached an intermediate depth of 987 metres where engineers have discovered "better than expected" sand quality in the lower langsat upper sand section, whilst preliminary interpretation of wireline, pressure as well as sampling data suggest that some "good quality reservoir" has been intersected.
Data collected on two of the shallower objectives that have already been logged also suggest the presence of low saturation hydrocarbons with sands appearing to be "water wet".
The chief executive of Tap, Peter Stickland, said that the combination of both the condition of the reservoir quality and the presence of low saturation hydrocarbons indicates "further opportunities" for the said objectives.
"These shallow Markisa-1 results will now be incorporated into our geologic of the Belait region to better define future drilling opportunities," he said and is looking forward to deeper drilling, which will commence within the next four to five days.
The Markisa-1 exploratory well that has been programmed to reach a well depth of 1,335 metres, is the second of a minimum of three wells to be drilled in Block M during Phase 1 exploration period that will end in August 2011.
It will also be used to evaluate several secondary targets within the Miocene Belait Formation and is expected to intersect the main Belait thrust fault.
The partners for Block M include operator Tap Energy (Borneo) with 39 per cent, Kulczky Oil Ventures with 36 per cent, China Sino Oil Company with 21 per cent and Jana Corporation with four per cent.
Kulczyk Oil also owns an interest in Block L, the other onshore exploration block in Brunei, through Kulczyk Oil Brunei Limited, an indirect wholly-owned subsidiary of Kulczyk Oil, which has a 40 per cent interest in Block L and in each of the Lukut-1 and Lempuyang-1 wells.
The first well, Lukut-1, was drilled on Brunei Block L and suspended in mid-June pending testing by a service rig. A second Block L well, Lempuyang-1, commenced drilling operations on July 15 and is currently logging. -- Courtesy of Borneo Bulletin

Tuesday, October 5, 2010

History Of Oil and Gas Industry in Brunei






HISTORY OF OIL ANG GAS INDUSTRY IN BRUNEI by Yusri@2009



  • 1899 - For the first time in Brunei history, oil well was drilled. It reached a depth of 850 feet below the Earth surface, unfortunately, this site ( found through floating oil seepage at Sungai Berkunchi)  contained no oil.

  • The easiest way to find oil field location in this era was by drilling well near the oil seepages spot besides a confirmation from Geology analysis.
  • It was not until 12 years after the first drilling, oil exploration was continued. British Borneo Petroleum Syndicate Limited made a Geological survey and drilled 4 wells at Bukit Puan and Belait anticline near Labi between year 1912 – 1917 but found no oil.

  • Singapore Consortium, the Shanghai Langkat Company was awarded right to explore small area of Jerudong and made 5 explorations on oil and gas. One of the drilled well containing oil but it has no commercial value.

  • Later Nederlandsche Koloniale Petroleum Maatschppij (A Dutch Company) made its first drill in Belait district

  • In the earliest 1920's Shell Exploration staff in Miri began to work further afield in Brunei and drilled a total of 8 wells but all were found to be dry holes. The Shell Group Company also introduced modern survey technique in a low relief with little Geology yield results.

  • British Malayan Petroleum Company, Shell subsidiary was formed in year 1922. Their first drilled well named Labi 5 found to be dried but later they found a well that produced gas at high pressure but was abandoned in 1931.

  • In 1926 while Mariott and Cocaharine who worked for British Malayan Petroleum in Miri were on the journey to Swiss Geophysict in Tali they stopped at Sungei Seria and smell oil fumes. This was the first evident towards oil exploration in Seria.

  • In 1928, during the oil exploration at Padang Berawa, hundreds of gas seepage containing Methane and Ethane were reported, which indicates a high possibility of oil and Gas field downward. A gravity method indicates two indistinct gravity lines and oil showing in shallow core holes.

  • British Malayan Company was then began the oil exploration in Seria
    • The ineffective cable tools equipments were used to punch hole into the ground using the pulley system.

    • After few feet hole were made, the bit were pull out and replaced with bailer (open tube with valve at the bottom) to remove the smashed rock and others.

    • The technology used during that years were not so discourage, tough and slow

    • Wall collapse and salt water flooding the well from higher sands caused the operation getting harder and more challenging.

    • Since the oil drilling via cable tools equipment was so slow, the operation which started in July 1928 and witnesses by Pengiran Jaya Negara pengiran Haji Abu Bakar was extended to year 1929.

    • The oil and gas strike for the first time from a commercial valued reservoir to the well at depth of 974 feet. Later, the name Padang Berawa disappeared and replaced with name Seria.

  • During these earliest year, Brunei had a very poor country development which indirectly slowing down the oil and gas industry

    • Transportation was so difficult,

      • Beach sides were used for land transportation
        • Sometimes affected by the water tidal.
        • Sometimes vehicle get bogged while using the road

      • Small rowing boat was used as a ferry to cross river but only available at certain time.

    • Wild water animals especially giant Crocodile make the place to be insecure
    • Stone were unavailable in this country and need to be imported from Niah which was a very far away.
    • Padang Berawa (Sungai Seria) is a swamp
      • Walking around this muddy area was very difficult like climbing
      • Water is a major problem here; the only available water supply was from the hidden depth roots with sour taste and red in colour.
      • The place is submerged by water during rainy season

  • By 1938 – Road between Kuala Belait and Seria were developed, transportation become easy and cheaper
  • February 1955 , first Seria Gas Plant was completed and ready for operation:
    • To process about 100 tons of Seria Crude oil each day.
    • To produce sufficient gasoline and fuel for country use. To deal with 3.2 million cubic metres of natural gas per day.

    • The underneath pressure became lower after oil was pumped out of the reservoir. Gas was injected to the fluid to 'reduce' its weight {specific gravity) therefore able to reach the surface.

    • 1933 – 1st offshore well was drilled from a single well platform connected to the shore by narrow boardwalk and the next few years encourage the development of deviated drilling or directional drilling which enable the hole to be 'bent' in any desired direction.

    • 1950s : decision was made that, it is more economic and undemanding to built a platform in the offshore to extract the oil/gas underneath sea compare if it was extracted via deviated well

    • 1957 : BMPC which required a major rule in Sultanate was reform to Brunei Shell Petroleum sendirian Berhad, BSP which is share by ratio of 50:50 ; Brunei Government and Royal Dutch

  • 1959 : High deviation well of angle 540 was implemented succesfully,
    • 1963 : First offshore oil well – South west Ampa, this reservoirs hold more than half of Brunei Darussalam's total gas reserves and gas production from the field accounts for 60 per cent of Brunei Production in year company's total production.

      • 1972:  Brunei Liquefied Natural Gas (LNG) plant opened this year and it is the 4th largest LNG plants in the world by that time

    • 1979 – Oil production was at the peak, over 250,000 barrels per day. Since then it has been deliberately cut back to extend the life of oil reserves and improve recovery rates

    • 2001 - His Royal Highness The Crown Prince Pengiran Muda Haji Al-Muhtadee Billah officially launches the opening up of new offshore Blocks J and K (10,000 sq.km total area) and in year 2005 : PetroleumBRUNEI launches the onshore Block L and M (5,264 sq.km)

    • 2002 - The incorporated of 100% government owned Oil Exploration and Production company - Brunei National Petroleum Company Sdn Bhd (PetroleumBRUNEI)

    • Gas Chemicals Company Inc., PetroleumBRUNEI and ITOCHU Corporation) is building the country's first methanol plant which is expected to operate by 2010.

  • Year 2000 estimation , Brunei reserve for oil is 1.4BBbbl and LNG at 13.8 Trillion scf

    • 2009 : BSP has spans more than 200 land and offshore structures linked by over 2,000km of pipeline, recovering oil and gas from 4,700 reservoirs and producing through 750 wells and within this 80 years, BSP has produce 6 billion barrel of oil
    • To date : A lot of advanced Technology has been brought to the country: such as fish hook wells to reach subsea reservoir, snake wells that weave several kilometers underground pockets of oil and gas and smart technologies which allows to monitor and control the operation , in real time from a comfort place in the office
 || The End ||

References:


    • G.C.Harper, 1975, The Discovery and Development Of The Seria Oilfield,
    • OOI Keat Gin, 2004, South East Asia, A Historical Encyclopedia, From Angkor Wat to West Timor, ISBN 1-57607-770-5, Google Book, page 276-277, http://books.google.com.bn/books?id=QKgraWbb7yoC&lpg=PP1&hl=en&pg=PR4#v=onepage&q=&f=false
    • Petroleum Brunei, News and Event, PB Website, retrieved on 14th October 2009, http://www.pb.com.bn/news.asp
    • Borneo Bulletin dated Apr 18th 2009, Ultra Modern Platform For New Oil Field,Brunei FM, retrieved on 29th October 2009, http://news.brunei.fm/2009/04/18/ultra-modern-platform-for-new-oil-field/
    (this is my assignment report for Dr Teh - Visitng lecturer from MOE@2009)

    The Discovery and Development of the Seria Oilfield



    Last Sunday, I was pleasantly surprised to find this book on display at Solitude at the Mall. I remembered this book vaguely some 30 years ago when my father bought it from the publisher, Brunei Museums. I could not find the book at my parents' house anymore, someone either pinched it or we could not find it among the many things being stored at my parents' house. Sometime last week, I saw it again for the first time since, displayed with many books on Brunei at the ICC for the Raja Payung Negara Exhibition. An evil thought did cross my mind of pinching the book but the angel in me told me that I will be able to find it sooner or later. And et voila! Solitude had about a dozen of the books at only $10 each.

    What's so great about 'The Discovery and Development of the Seria Oilfield' written by GC Harper? Well, first of all, this the only book in existence that I know of describing events about how the Seria oilfield (our country's lifeline) was discovered and the many developments to build up Seria up to about 1970s (the book was published in 1975 and reprinted in 1990). That said, there are many things we do not know about. For instance, did you know that oil was discovered in Miri first in 1910 and not in Seria? And that Shell first worked out of Miri to develop both the Miri and Seria oilfields? So there are a great many things we do not know about. Of course, cynics will say that this knowledge is not critical. I agree but knowing the past is fun especially for history buffs like me.

    A number of new knowledge which I thought I will share with you all. The location of the first well to be drilled in Brunei specifically to produce oil was not in Seria. It was at Ayer Berkunci (around the Sungai Kebun Kampung Ayer area). It was not the 20th century but in the 19th century, albeit the last year of the 19th century - 1899. Why drill here? Oil prospectors in the 19th century already suspected that the Borneo island area had oil potential as there were many seepages (oil coming up to the surface) found in many areas. In Labuan, the search was on as early as 1866. Sometime in 1911, they started drilling in Labi and Bukit Puan in Belait. In 1923, they drilled in Tutong. But drilling continued in the Belait District until oil was discovered in Seria in 1929.

    Seria was not called Seria then. The local name was Padang Berawa (Berawa is some sort of wild pigeon). Padang Berawa covers the area between Sungai Seria and Sungai Bera. And it was a swamp. The water in the area was dark red and and not suitable for human consumption. During rainy season, the whole area is submerged in water. But once oil was discovered, for some reason, the name Padang Berawa disappeared. The little river, Sungai Seria now provided the name, Seria to the newly developed town that was built for all the workers converging there.

    How did they discovered the Seria oilfields? According to Salam, the Shell newspaper, a Mr. Mariott and Hon. Cochrane (later to become Lord Chochrane of Cults), both working for Sarawak Oilfields Ltd (SOL), in 1926 visited Kuala Belait which then consisted of a few fishermen's huts, on their way to visit a geologist somewhere in the Sungai Tali/Lumut area. On the way they stopped at Sungai Seria and while resting there, Cochrane smelled oil and discussed his hunch with the geologist and decided that the search for oil should be extended to the south (Seria) leading to the first well to be drilled in Seria in 1928. Oil was discovered in 1929 after the well had deepened to about 974 feet and you know the history of it since.

    There were many companies searching for oil in Brunei then as compared to now. Among them include the British Borneo Petroleum Syndicate Limited, the Shanghai Langkat Company (a Singapore consortium), Nederlandsche Koloniale Petroleum Maatschappij (a Dutch company), the Anglo-Saxon Petroleum Company Limited (drilled in Tutong), Asiatic Petroleum Company (Federated Malay States) Limited and the British Malayan Petroleum Company Limited (BMPC). The latter two are Shell companies. The current Brunei Shell Petroleum Company Limited was not formed until 1957, being the first company to be registered under the new Companies Act taking over from the BMPC.

    Another Oil Exploration


    Sep 27, 2010 06:21 ET

    Kulczyk Oil Participating In Fourth Brunei Exploration Well

    CALGARY, ALBERTA--(Marketwire - Sept. 27, 2010) - Kulczyk Oil Ventures Inc. ("Kulczyk Oil" or "KOV") (WARSAW:KOV) announces that the Markisa-1 well on Block M in Brunei Darussalam has commenced drilling. Markisa-1 is the second well to be drilled on Block M during 2010 by Kulczyk Oil and its joint venture partners. The first well on Block M, Mawar-1, was cased to total depth in mid-September and suspended pending testing.
    The Markisa prospect was identified on the 3D seismic data acquired by the joint venture in 2009. The prospect is a separate undrilled fault compartment identified within the greater Belait Anticline. Given the drilling history within the Belait trend, the Markisa-1 well is considered to be low-to- moderate risk.
    Markisa-1 is being drilled as a deviated well to test a sandstone reservoir that produced oil in the 1920's and early 1930s in an adjacent fault block. The well will also evaluate several secondary targets within the Miocene Belait Formation and is expected to intersect the main Belait thrust fault. The well is designed to a total depth of approximately 1,335 metres.
    The well is being drilled by the MB Century Rig 104 and is expected to take approximately 28 days to drill and evaluate on a trouble free basis. In the case of a discovery, the well is likely to be suspended pending testing by another rig designed for that purpose. The well is located 30 kilometres south of the giant Seria oil field and the facilities in that area which include an oil refinery and terminal and the Brunei liquefied natural gas (LNG) facility.
    The partners in Brunei Block M and in the Markisa-1 well are KOV Borneo Limited (36%), Tap Energy (Borneo) Pty Ltd (39%), China Sino Oil Co. Ltd. (21%) and Jana Corporation Sdn Bhd (4%). KOV Borneo Limited is an indirect wholly-owned subsidiary of Kulczyk Oil. The Markisa-1 exploratory well is the second of a minimum of three wells to be drilled on Block M by Kulczyk Oil and its joint venture partners in Block M during the Phase 1 exploration period ending in August 2011.
    Kulczyk Oil Brunei Limited, another indirect wholly-owned subsidiary of Kulczyk Oil, has a 40% interest in Block L to the north of Block M. The first well on Block L, Lukut-1, was drilled to total depth and suspended in mid-June pending testing by a service rig. A second Block L well, Lempuyang-1, commenced drilling operations on July 15 and is currently drilling.

    Drilling Animation : Simple

    Checkout this simple animation about drilling.